Sidewalk Shed Cost Included in MCI Increase
LVT Number: #27184
Landlord applied for MCI rent hikes based on facade and parapet wall replacement. The DRA ruled for landlord in part, but disallowed “mobilization costs” of $11,500. Landlord appealed and won. The mobilization costs cited in landlord’s application were not merely incidental but referred to the installation of a sidewalk shed that was a necessary security measure for exterior restorations and for continued mobilization. This cost was includable as part of the MCI cost.
Langsam Property Services Corp.: DHCR Adm. Rev. Docket No. BS610046RO (6/24/16) [2-pg. doc.]
Downloads
BS610046RO.pdf | 680.19 KB |