New Vacuum System Doesn't Qualify
LVT Number: 16122
Landlord applied for MCI rent hikes based on the installation of a new vacuum system. The DRA ruled against landlord. Landlord appealed and lost. A vacuum system is an optional addition to a heating system and doesn't qualify as an MCI by itself. Since landlord didn't install the vacuum system in connection with a qualifying boiler installation, no MCI hike was warranted.
235 W. 76th St.: DHCR Admin. Rev. Dckt. No. QF430025RO (9/18/02) [2-pg. doc.]
Downloads
QF430025RO.pdf | 91.39 KB |