Cost of Fuel Storage Tank Installation Included

LVT Number: 16450

Landlord applied for MCI rent hikes based on a number of improvements. The DRA granted MCI rent hikes for a boiler/burner and consulting services but denied any rent hike for a fuel storage tank and other improvements. Landlord appealed and won. The fuel storage tank was directly related to the boiler/burner installation and, so, qualified as an MCI.

Landlord applied for MCI rent hikes based on a number of improvements. The DRA granted MCI rent hikes for a boiler/burner and consulting services but denied any rent hike for a fuel storage tank and other improvements. Landlord appealed and won. The fuel storage tank was directly related to the boiler/burner installation and, so, qualified as an MCI.

ABM Mgmt. Corp.: DHCR Adm. Rev. Dckt. No. PF110089RO (2/11/03) [3-pg. doc.]

Downloads

PF110089RO.pdf175.61 KB