Landlord applied for MCI rent hikes based on installation of a chimney relining and boiler. The DRA ruled against landlord, finding that the application was untimely. Landlord appealed and lost. Landlord argued that...
Landlord applied for MCI rent hikes based on installation of a backflow preventer and water boosting system. The DRA ruled against landlord, who appealed and lost. Installation of a backflow prevention device...
Landlord applied for MCI rent hikes based on burner replacement. The DRA ruled against landlord, who appealed and lost. On the date that the MCI application was filed in August 2015, one immediately hazardous "C...
Landlord applied for MCI rent hikes based on elevator upgrading. The DRA ruled against landlord, who appealed and lost. The DRA found that two of the building's eight apartments weren't served by the elevator...
Landlord applied for MCI rent hikes based on installation of a new boiler. The DRA ruled against landlord based on its failure to submit proof of a Certificate of Electrical Inspection from DOB. Landlord appealed and...
Landlord of the LeFrak City housing complex applied for MCI rent increases for four buildings with a separate connecting lobby structure based on lobby renovations. The DRA ruled for landlord in part but disallowed...
Landlord applied for MCI rent hikes based on installation of a new fire alarm system, fire alarm engineer costs, and burner replacement. The DRA ruled against landlord, who appealed and lost. The DHCR has...
Landlord applied for MCI rent hikes based on several installations. The DRA granted an MCI increase for one lobby door but disallowed any increase for the refurbishment of a revolving door and two side doors as well...
Landlord applied for MCI rent hikes based on building exterior restoration, with related consulting work, and terrace/roof replacement. The DRA ruled for landlord. Tenants appealed and won, in part. Tenants claimed...
Landlord applied for MCI rent hikes based on installation of a backflow preventer, including engineering costs. The DRA ruled against landlord, finding that landlord's MCI application wasn't filed within two...
Landlord applied for MCI rent hikes based on replacement of an HVAC system, including related general construction and engineering costs. The DRA ruled against landlord, finding that the work was done on a piecemeal...
The DRA denied landlord's application for MCI rent hikes based on cement, stucco, aluminum capping work on a parapet wall, and aluminum air vents. Landlord appealed and lost. Landlord claimed that the entire...