Windows Not Installed in Piecemeal Manner
LVT Number: 13486
Landlord applied for MCI rent hikes based on the installation of new apartment windows. The DRA ruled against landlord, finding that the work was done in a piecemeal manner. Landlord appealed, pointing out that the work was done by landlord's contractor within a seven-month period, and landlord paid the contractor in a number of installments during this time. Landlord had submitted all required documentation of the work and payments. The DHCR ruled for landlord.
689 Halsey St.: DHCR Adm. Rev. Dckt. No. HB230164RO (6/21/99) [3-pg. doc.]
Downloads
HB230164RO.pdf | 168.69 KB |