Landlord applied for MCI rent hikes based on roof work and a facade restoration. The DRA ruled against landlord. Landlord appealed and lost. Landlord's documents showed that in 1999 the main roof and bulkhead roofs were replaced and south facade repointing was done. Some time later, landlord removed and replaced the roofing system on the first floor, the north and west terraces, and the penthouses. Landlord also replaced and repointed other brickwork on the north wall. The later work was the subject of landlord's current MCI application.

Landlord applied for MCI rent hikes based on roof work and a facade restoration. The DRA ruled against landlord. Landlord appealed and lost. Landlord's documents showed that in 1999 the main roof and bulkhead roofs were replaced and south facade repointing was done. Some time later, landlord removed and replaced the roofing system on the first floor, the north and west terraces, and the penthouses. Landlord also replaced and repointed other brickwork on the north wall. The later work was the subject of landlord's current MCI application. Landlord's records showed that the work had been done piecemeal. The DRA properly had denied landlord's application.

315 East 72nd St.: DHCR Adm. Rev. Docket No. UD410047RO (11/9/06) [2-pg. doc.]

Downloads

UD410047RO.pdf128.48 KB